Metal furring system
The term 'metal furring system', or MF system, refers to a non-structural metal attachment that is used to hold a finish material, often used as a technique for creating a seamless plaster internal finish with a void behind for the installation of services, with plasterboard fixed directly to the concealed metal furrings. It can be used as an alternative to traditional timber batten construction for walls and ceilings.
In metal-framed construction, the furring pieces are long, light gauge materials (usually 25 or 20 ga.) of various shapes, often used to hold insulation or other construction items between materials. Due to the light gauge, a certain amount of rigidity is provided by the bends that create the cross section shapes.
A ‘hat’-shaped bent metal is the most common type of metal furring. This is used to secure the outer layer of material where it would be difficult to insert attachments such as screws and nails.
A ‘z’ furring is attached to one surface at the bottom flange, accepting an outer layer of material to be attached to the other flange. This is often used in commercial and residential buildings as a spacer, allowing an existing wall surface to be insulated, or allowing horizontal electrical or plumbing components to be installed and covered with a finish material.
A variety of fastening methods can be used with a metal furring system. Screws are the most common and easiest, although when the furring strip is attached directly to concrete, masonry or structural steel, more specialised fasteners are used such as sleeve type anchors, course thread anchors, power actuated pin fasteners, and so on.
[edit] Related articles on Designing Buildings
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February